Contract R150 – Trackwork for Bishan Depot, Ulu Pandan Depot and Pasir Ris Rail Turnback

Client: Land Transport Authority Singapore (LTA)

r150-1.jpg

R150 is trackwork design and construction contract for LTA Singapore. This is a mix of brown field and green field project in existing operational depots and construction of the new Turnback track at Pasir Ris overrun.

r150-2.jpg

This includes track renewal works at Bishan and Ulu Pandan Depot, Installation of new Track at Bishan Depot and Pasir Ris Turnback.